Lekaroz, Navarra. spain

(0 ratings)

Lozy’s Pharmaceuticals factory

GVG Estudio (Daniel Galar, Josecho Vélaz y Javier Gil) + Vaillo-Irigaray (Antonio Vaillo y Juan L. Irigaray)

Description Technical file

The obvious fragility of the landscape of Baztán valley in Navarre was dealt with very skilfully in this project, taking into account the final dimension of the planned units.
New plant for the manufacture of oropharyngeal lozenges belonging to a pharmaceutical company. Situated in an idyllic landscape, the Baztán valley in northern Navarre, it generated some concern among the area’s neighbours given the potential impact of such a large industrial unit.
As a consequence of these conditioning factors, a smaller building than the one initially planned by the owners was ultimately designed, with a better interior layout to improve workflows, reflecting elements that identify the valley’s architecture such as sloping roofs and establishing a sequence of planes that mirror those of the surrounding hills.
Despite its dimensions, the result is a project that not only integrates into its setting but also interacts and dialogues with it. In the end, the valley’s population was pleasantly surprised.
The building functions optimally and provides a relevant corporate image, an aspect that is often ignored owing to the usual confusion about issues such as the possible poorer functioning or higher cost of a construction of such characteristics compared to the typical “units” found on industrial estates. Better functioning, image and integration into the setting with identical financial investment.


Full report in On 374, available at all reputable
points of sale and from our online shop.

add to my library

Share |

 

+ on the same author/s
         
   
0 comments


Do you want to write a comment?
Login to start session.
Localización Location: Lekaroz, Navarra. Spain. Arquitectos Architects: GVG Estudio (Daniel Galar, Josecho Vélaz y Javier Gil) + Vaillo-Irigaray (Antonio Vaillo y Juan L. Irigaray). Técnicos colaboradores Collaborating technicians: Mendyra (Eduardo Iraola + Jesús Jamar + Luis Echamendi), TCI Tecnologías críticas para la industria. Cálculo estructuras Structure calculation: Raúl Escrivá Peyró. Promotor Developer: Geiser Pharma + Lozy’s Pharmaceuticals. Constructora General Contractor: Mendyra, S.L. Fecha inicio y finalización de la obra Start and completion date of the works: Octubre 2014 - julio 2016. Superficie construida Built area: 3.254 m2. Fotografía Photography: Rubén Pérez Bescós.
Suppliers list
Estructura metálica, cubierta y cierres: Talleres Baitegia www.talleresbaitegia.es info@talleresbaitegia.es
Estudio de iluminación: Elektra www.grupoelektra.es pamplona@grupoelektra-sa.es
Contact
Juan Luis Irigaray Huarte
Pamplona, Navarra
www.vailloirigaray.com
Vaíllo & Irigaray

Antonio Vaillo

GVG Estudio
Pamplona, Navarra
www.gvgestudio.com
Daniel Galar Irurre

Josecho Vélaz Ballesteros

Gil Ayesa, Javier

Photography
Rubén Pérez Bescós
Madrid
http://www.rubenpb.com/